<?xml version="1.0" encoding="utf-8" standalone="yes"?>
<TEI xmlns="http://www.tei-c.org/ns/1.0">
  <teiHeader>
    <fileDesc>
      <titleStmt>
        <title type="main" level="a">A Value Stream Mapping Approach to the Identification of Lean Management Opportunities for Off-Site Construction Production: A Case of Reinforced Concrete Slabs</title>
        <author>
          <persName n="1">
            <forename>Zhe</forename>
            <surname>Chen</surname>
            <placeName type="affiliation">The University of Hong Kong, Hong Kong</placeName>
          </persName>
          <persName n="2" ref="https://orcid.org/0009-0003-6040-551X" type="ORCID">
            <forename>Zhengting</forename>
            <surname>Guo</surname>
            <placeName type="affiliation">China State Construction Hailong Technology Company Limited, China</placeName>
          </persName>
          <persName n="3" ref="https://orcid.org/0000-0003-2217-3693" type="ORCID">
            <forename>Fan</forename>
            <surname>Xue</surname>
            <placeName type="affiliation">The University of Hong Kong, China</placeName>
          </persName>
        </author>
        <respStmt>
          <resp>This is a section of <title>CONVR 2023 - Proceedings of the 23rd International Conference on  Construction Applications of Virtual Reality </title>(DOI: <idno type="DOI">10.36253/979-12-215-0289-3</idno>) by </resp>
          <name>Pietro Capone, Vito Getuli, Farzad Pour Rahimian, Nashwan Dawood, Alessandro Bruttini, Tommaso Sorbi</name>
        </respStmt>
      </titleStmt>
      <publicationStmt>
        <publisher>Firenze University Press</publisher>
        <pubPlace>Florence</pubPlace>
        <date when="2023">2023</date>
        <idno type="DOI">https://doi.org/10.36253/10.36253/979-12-215-0289-3.38</idno>
        <availability>
          <p>Available for academic research purposes</p>
          <p>Open Access</p>
          <p>Copyright Author(s)</p>
          <licence source="text" target="https://creativecommons.org/licenses/by-nc/4.0/legalcode">
            <p>Content licence CC BY-NC 4.0</p>
          </licence>
          <licence source="metadata" target="https://creativecommons.org/publicdomain/zero/1.0/legalcode">
            <p>Metadata licence CC0 1.0</p>
          </licence>
        </availability>
      </publicationStmt>
      <sourceDesc>
        <p>This is original content, published for academic research purposes</p>
      </sourceDesc>
    </fileDesc>
    <encodingDesc>
      <appInfo>
        <application version="2.2" ident="Booksflow">
          <desc>Digital edition XML powered by Booksflow</desc>
        </application>
      </appInfo>
    </encodingDesc>
    <profileDesc>
      <abstract xml:lang="en">
        <p>Off-site construction (OSC), including prefabrication and Modular-integrated Construction (MiC), is gaining popularity as a school of sustainable construction methods that can improve productivity, quality, and waste reduction. However, OSC projects face challenges related to technical integration, collaboration among stakeholders, and dynamic uncertainties. As a result, high-quality standards throughout the manufacturing process of OSC products are difficult to ensure, leading to costly rework, delays, and safety issues. This paper applies a value stream mapping (VSM) approach based on lean principles to OSC production for identifying lean management opportunities for off-site construction production. The case studied in this paper is reinforced concrete slabs. First, we employed a combination of field investigations and interviews to formalize the flow of materials and information for the case. Then, VSM processed the flow for the current state map, which highlights twelve opportunities to prioritize for slab production, e.g., the adoption of digital technology (VR, BIM) in information flows. The findings in value-added activities improvement of the opportunities demonstrate the potential of lean management in the slab production case. Furthermore, the VSM approach in this paper can identify the ‘wastes’ in lean theory, which are the control points of OSC production, for enhancing quality, efficiency, and resource utilization. The findings contribute to the existing body of knowledge by providing empirical evidence of the VSM approach to the identification of lean management opportunities for OSC production</p>
      </abstract>
      <textClass>
        <keywords>
          <list>
            <item>Off-site construction</item>
            <item>Prefabricated products</item>
            <item>Lean management</item>
            <item>Value stream mapping</item>
            <item>Quality assurance</item>
            <item>Construction industrialization</item>
            <item>Lean construction</item>
          </list>
        </keywords>
      </textClass>
    </profileDesc>
  </teiHeader>
  <text>
    <body>
      <p>It is available online at https://doi.org/10.36253/10.36253/979-12-215-0289-3.38<ref target="https://doi.org/10.36253/10.36253/979-12-215-0289-3.38" /></p>
      <div>
        <listBibl>
          <head>References</head>
          <bibl n="137803">
            <bibl>Chen, J. C., Li, Y., &amp;amp; Shady, B. D. (2008). From value stream mapping toward a lean/sigma continuous improvement process: an industrial case study. International Journal of Production Research, 48(4), 1069–1086.</bibl>
            <idno type="DOI">10.1080/00207540802484911</idno>
          </bibl>
          <bibl n="136725">
            <bibl>Fontanini, P. S. P., De Souza Milano, C., Fujimoto, A., Lintz, R. C. C., Barbosa, L. a. G., De Avila Jacintho, A. E. P. G., &amp;amp; Pimentel, L. L. (2013). Concrete slab Value stream mapping of Brazilian residential buildings - A lean construction study case. Advanced Materials Research, 690–693, 829–834.</bibl>
            <idno type="DOI">10.4028/www.scientific.net/amr.690-693.829</idno>
          </bibl>
          <bibl n="138196">
            <bibl>Grewal, C. S. (2008). An initiative to implement lean manufacturing using value stream mapping in a small company. International Journal of Manufacturing Technology and Management, 15(3/4), 404.</bibl>
            <idno type="DOI">10.1504/ijmtm.2008.020176</idno>
          </bibl>
          <bibl n="137652">
            <bibl>Heravi, G., &amp;amp; Firoozi, M. (2016). Production process improvement of buildings’ prefabricated steel frames using value stream mapping. The International Journal of Advanced Manufacturing Technology, 89(9–12), 3307–3321.</bibl>
            <idno type="DOI">10.1007/s00170-016-9306-9</idno>
          </bibl>
          <bibl n="137578">
            <bibl>Hosseini, M. R., Martek, I., Zavadskas, E. K., Aibinu, A. A., Arashpour, M., &amp;amp; Chileshe, N. (2018). Critical evaluation of off-site construction research: A Scientometric analysis. Automation in Construction, 87, 235–247.</bibl>
            <idno type="DOI">10.1016/j.autcon.2017.12.002</idno>
          </bibl>
          <bibl n="137822">
            <bibl>Khalili, A., &amp;amp; Chua, D. K. H. (2014). Integrated prefabrication configuration and component grouping for resource optimization of precast production. Journal of the Construction Division and Management, 140(2).</bibl>
            <idno type="DOI">10.1061/(asce)co.1943-7862.0000798</idno>
          </bibl>
          <bibl n="139457">
            <bibl>Ko, C., &amp;amp; Kuo, J. (2015). MAKING FORMWORK CONSTRUCTION LEAN. Journal of Civil Engineering and Management, 21(4), 444–458.</bibl>
            <idno type="DOI">10.3846/13923730.2014.890655</idno>
          </bibl>
          <bibl n="139656">
            <bibl>Koskela, L. (1993). Lean production in construction. Proceedings of the . . . ISARC.</bibl>
            <idno type="DOI">10.22260/isarc1993/0007</idno>
          </bibl>
          <bibl n="137719">
            <bibl>Lee, D. Y., Chi, H., Wang, J., Wang, X., &amp;amp; Park, C. (2016). A linked data system framework for sharing construction defect information using ontologies and BIM environments. Automation in Construction, 68, 102–113.</bibl>
            <idno type="DOI">10.1016/j.autcon.2016.05.003</idno>
          </bibl>
          <bibl n="137153">
            <bibl>Li, C. Z., Chen, Z., Xue, F., Kong, X. T., Xiao, B., Lai, X., &amp;amp; Zhao, Y. (2021). A blockchain- and IoT-based smart product-service system for the sustainability of prefabricated housing construction. Journal of Cleaner Production, 286, 125391.</bibl>
            <idno type="DOI">10.1016/j.jclepro.2020.125391</idno>
          </bibl>
          <bibl n="138124">
            <bibl>Loss, C., Piazza, M., &amp;amp; Zandonini, R. (2016). Connections for steel–timber hybrid prefabricated buildings. Part II: Innovative modular structures. Construction and Building Materials, 122, 796–808.</bibl>
            <idno type="DOI">10.1016/j.conbuildmat.2015.12.001</idno>
          </bibl>
          <bibl n="138512">
            <bibl>Lu, W., Chen, K., Xue, F., &amp;amp; Pan, W. (2018). Searching for an optimal level of prefabrication in construction: An analytical framework. Journal of Cleaner Production, 201, 236–245.</bibl>
            <idno type="DOI">10.1016/j.jclepro.2018.07.319</idno>
          </bibl>
          <bibl n="139375">
            <bibl>Mitolo, N., Nesi, P., Pantaleo, G., &amp;amp; Paolucci, M. (2021). Snap4City Platform to Speed Up Policies. In Green energy and technology.</bibl>
            <idno type="DOI">10.1007/978-3-030-57764-3_7</idno>
          </bibl>
          <bibl n="137653">
            <bibl>Park, C., Lee, D., Kwon, O., &amp;amp; Wang, X. (2013). A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Automation in Construction, 33, 61–71.</bibl>
            <idno type="DOI">10.1016/j.autcon.2012.09.010</idno>
          </bibl>
          <bibl n="138714">
            <bibl>Rahani, A. R., &amp;amp; Al-Ashraf, M. (2012). Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study. Procedia Engineering, 41, 1727–1734.</bibl>
            <idno type="DOI">10.1016/j.proeng.2012.07.375</idno>
          </bibl>
          <bibl n="138367">
            <bibl>Rahimian, F. P., &amp;amp; Ibrahim, R. (2011). Impacts of VR 3D sketching on novice designers’ spatial cognition in collaborative conceptual architectural design. Design Studies, 32(3), 255–291.</bibl>
            <idno type="DOI">10.1016/j.destud.2010.10.003</idno>
          </bibl>
          <bibl n="138612">
            <bibl>Sacks, R., Girolami, M., &amp;amp; Brilakis, I. (2020). Building information modelling, artificial intelligence and construction tech. Developments in the Built Environment, 4, 100011.</bibl>
            <idno type="DOI">10.1016/j.dibe.2020.100011</idno>
          </bibl>
          <bibl n="138217">
            <bibl>Sacks, R., Koskela, L., Dave, B., &amp;amp; Owen, R. (2010). Interaction of lean and building information modeling in construction. Journal of the Construction Division and Management, 136(9), 968–980.</bibl>
            <idno type="DOI">10.1061/(asce)co.1943-7862.0000203</idno>
          </bibl>
          <bibl n="136992">
            <bibl>Wu, G., Yang, R., Li, L., Bi, X., Liu, B., Li, S., &amp;amp; Zhou, S. (2019). Factors influencing the application of prefabricated construction in China: From perspectives of technology promotion and cleaner production. Journal of Cleaner Production, 219, 753–762.</bibl>
            <idno type="DOI">10.1016/j.jclepro.2019.02.110</idno>
          </bibl>
          <bibl n="137265">Wu, P., &amp;amp; Pheng, L. S. (2011). Lean production, value chain and sustainability in precast concrete factory - a case study in Singapore. Lean Construction Journal, 92–109. https://www.leanconstruction.org/media/docs/lcj/2011/LCJ_10_007.pdf</bibl>
          <bibl n="137191">
            <bibl>Xue, F., Chen, K., Lu, W., Niu, Y., &amp;amp; Huang, G. Q. (2018). Linking radio-frequency identification to Building Information Modeling: Status quo, development trajectory and guidelines for practitioners. Automation in Construction, 93, 241–251.</bibl>
            <idno type="DOI">10.1016/j.autcon.2018.05.023</idno>
          </bibl>
          <bibl n="138958">
            <bibl>Xue, F., Wu, L., &amp;amp; Lu, W. (2021). Semantic enrichment of building and city information models: A ten-year review. Advanced Engineering Informatics, 47, 101245.</bibl>
            <idno type="DOI">10.1016/j.aei.2020.101245</idno>
          </bibl>
          <bibl n="137970">
            <bibl>Yu, H., Tweed, T., Al-Hussein, M., &amp;amp; Nasseri, R. (2009). Development of lean model for house construction using value stream mapping. Journal of the Construction Division and Management, 135(8), 782–790.</bibl>
            <idno type="DOI">10.1061/(asce)0733-9364(2009)135:8(782</idno>
          </bibl>
          <bibl n="138973">
            <bibl>Zhao, R., Chen, Z., &amp;amp; Xue, F. (2023). A blockchain 3.0 paradigm for digital twins in construction project management. Automation in Construction, 145, 104645.</bibl>
            <idno type="DOI">10.1016/j.autcon.2022.104645</idno>
          </bibl>
        </listBibl>
      </div>
    </body>
  </text>
</TEI>