        <title type="main" level="a">Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process</title>
        <author>
          <persName n="1">
            <forename>Efraim</forename>
            <surname>Ljung</surname>
            <placeName type="affiliation">Skanska AB, Sweden</placeName>
          </persName>
          <persName n="2" ref="https://orcid.org/0000-0001-7667-8334" type="ORCID">
            <forename>Mikael</forename>
            <surname>Viklund Tallgren</surname>
            <placeName type="affiliation">Chalmers University of Technology, Sweden</placeName>
          </persName>
          <persName n="3" ref="https://orcid.org/0000-0002-3706-8485" type="ORCID">
            <forename>Mattias</forename>
            <surname>Roupé</surname>
            <placeName type="affiliation">Chalmers University of Technology, Sweden</placeName>
          </persName>
          <persName n="4" ref="https://orcid.org/0000-0002-6108-8662" type="ORCID">
            <forename>Mikael</forename>
            <surname>Johansson</surname>
            <placeName type="affiliation">Chalmers University of Technology, Sweden</placeName>
          </persName>
        </author>
        <respStmt>
          <resp>This is a section of <title>CONVR 2023 - Proceedings of the 23rd International Conference on  Construction Applications of Virtual Reality </title>(DOI: <idno type="DOI">10.36253/979-12-215-0289-3</idno>) by </resp>
          <name>Pietro Capone, Vito Getuli, Farzad Pour Rahimian, Nashwan Dawood, Alessandro Bruttini, Tommaso Sorbi</name>
        </respStmt>
      </titleStmt>
      <publicationStmt>
        <publisher>Firenze University Press</publisher>
        <pubPlace>Florence</pubPlace>
        <date when="2023">2023</date>
        <idno type="DOI">https://doi.org/10.36253/10.36253/979-12-215-0289-3.56</idno>
        <availability>
          <p>Available for academic research purposes</p>
          <p>Open Access</p>
          <p>Copyright Author(s)</p>
          <licence source="text" target="https://creativecommons.org/licenses/by-nc/4.0/legalcode">
            <p>Content licence CC BY-NC 4.0</p>
          </licence>
          <licence source="metadata" target="https://creativecommons.org/publicdomain/zero/1.0/legalcode">
            <p>Metadata licence CC0 1.0</p>
          </licence>
        </availability>
      </publicationStmt>
      <sourceDesc>
        <p>This is original content, published for academic research purposes</p>
      </sourceDesc>
    </fileDesc>
    <encodingDesc>
      <appInfo>
        <application version="2.2" ident="Booksflow">
          <desc>Digital edition XML powered by Booksflow</desc>
        </application>
      </appInfo>
    </encodingDesc>
    <profileDesc>
      <abstract xml:lang="en">
        <p>The construction industry is undergoing a significant shift in how design and production are conducted. Building Information Modeling (BIM) has emerged as a key tool for coordinating information from all involved disciplines and providing a more holistic view of the construction process. However, effective coordination and communication between different professions remain major challenges that require new approaches to project management. Takt planning has gained increasing attention as a potential solution to improve traditional planning methods. Despite this, there is a lack of real-world studies exploring BIM and takt planning where information is structured according to takt planning. A takt planning structure for all BIM-models would bring a more holistic understanding of what is to be done, controlled, and reported back. To address this gap, this paper presents findings from a three-stage research process. Firstly, form a focus group of disciplines to find a shared structure to present the execution in a common way for design and construction in a lab environment at a conceptual level, secondly implementing it to the detailed design information for real -world case project in workshops and group meetings with the focus group and then thirdly, evaluate it in the case project with the site staff involved. The findings highlight the importance of a shared denominator to get a holistic approach to project management and enabling takt planning throughout all phases of construction, providing insights into its practical application and benefits for the construction industry</p>
      </abstract>
      <textClass>
        <keywords>
          <list>
            <item>WBS; Building information modeling (BIM); Project Management; Takt planning</item>
          </list>
        </keywords>
      </textClass>
    </profileDesc>
  </teiHeader>
  <text>
    <body>
      <p>It is available online at https://doi.org/10.36253/10.36253/979-12-215-0289-3.56<ref target="https://doi.org/10.36253/10.36253/979-12-215-0289-3.56" /></p>
      <div>
        <listBibl>
          <head>References</head>
          <bibl n="138679">Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241–252.</bibl>
          <bibl n="138489">
            <bibl>Borrmann, A., K&amp;#246;nig, M., Koch, C., &amp;amp; Beetz, J. (2018). Building information modeling: Why? What? How? In Building Information Modeling: Technology Foundations and Industry Practice.</bibl>
            <idno type="DOI">10.1007/978-3-319-92862-3_1</idno>
          </bibl>
          <bibl n="137515">
            <bibl>Cerezo-Narv&amp;#225;ez, A., Pastor-Fern&amp;#225;ndez, A., Otero-Mateo, M., &amp;amp; Ballesteros-P&amp;#233;rez, P. (2020). Integration of cost and work breakdown structures in the management of construction projects. Applied Sciences (Switzerland), 10(4).</bibl>
            <idno type="DOI">10.3390/app10041386</idno>
          </bibl>
          <bibl n="139065">
            <bibl>Crowther, J., &amp;amp; Ajayi, S. O. (2019). Impacts of 4D BIM on construction project performance. International Journal of Construction Management, 0(0), 1–14.</bibl>
            <idno type="DOI">10.1080/15623599.2019.1580832</idno>
          </bibl>
          <bibl n="136877">Disney, O., Johansson, M., Domenico Leto, A., Roup&amp;#233;, M., Sundquist, V., &amp;amp; Gustafsson, M. (2021). Total BIM Project: The future of a digital construction process. Industry 4.0 Applications for Full Lifecycle Integration of Buildings, 21–30. https://research.chalmers.se,</bibl>
          <bibl n="137943">Eckerberg, K., Edgar, J.-O., Engstr&amp;#246;m, A., Lundgren, T., Onsbring, L., T&amp;#246;rnkvist, M., T&amp;#246;nne, M., &amp;#214;st, T., Bruhner, N., &amp;amp; Lundgren, A. (2016). CoClass och LOD Livscykeltest av CoClass-nya generationen BSAB.</bibl>
          <bibl n="137154">
            <bibl>Garcı&amp;#225;-Fornieles, J. M., Fan, I.-S., Perez, A., Wainwright, C., &amp;amp; Sehdev, K. (2003). A Work Breakdown Structure that Integrates Different Views in Aircraft Modification Projects. Concurrent Engineering: Research and Applications, 11(1), 47–54.</bibl>
            <idno type="DOI">10.1177/106329303032818</idno>
          </bibl>
          <bibl n="138440">
            <bibl>Gaunt, M. (2017). BIM model-based design delivery: Tideway East, England, UK. Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction, 170(3), 50–58.</bibl>
            <idno type="DOI">10.1680/jsmic.17.00011</idno>
          </bibl>
          <bibl n="138618">Haghsheno, S., Binninger, M., Dlouhy, J., &amp;amp; Sterlike, S. (2016). History and Theoretical Foundations of Takt Planning and Takt Control. Proceedings IGLC-24, 53–62. www.wissen.de</bibl>
          <bibl n="137430">Howard, R., Kiviniemi, A., &amp;amp; Samuelson, O. (2002, June). The latest developments in communications and e-commerce - IT barometer in 3 Nordic countries. Distributing Knowledge in Building, CIB W78 Conference. http://itc.scix.net/</bibl>
          <bibl n="137886">
            <bibl>Jung, Y., Asce, A. M., &amp;amp; Kang, S. (2007). Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control. Journal of Construction Engineering and Mangement, 133(1), 10–21.</bibl>
            <idno type="DOI">10.1061/ASCE0733-93642007133:110</idno>
          </bibl>
          <bibl n="138130">
            <bibl>Leicht, D., Castro-Fresno, D., D&amp;#236;az, J., &amp;amp; Baier, C. (2020). Multidimensional construction planning and agile organized project execution-The 5D-PROMPT method. Sustainability (Switzerland), 12(16).</bibl>
            <idno type="DOI">10.3390/SU12166340</idno>
          </bibl>
          <bibl n="138593">
            <bibl>Makarfi Ibrahim, Y., Kaka, A., Aouad, G., &amp;amp; Kagioglou, M. (2009). Framework for a generic work breakdown structure for building projects. Construction Innovation, 9(4), 388–405.</bibl>
            <idno type="DOI">10.1108/14714170910995930</idno>
          </bibl>
          <bibl n="138940">
            <bibl>Mohd Nawi, M. N., Baluch, N., &amp;amp; Bahauddin, A. Y. (2014). Impact of fragmentation issue in construction industry: An overview. MATEC Web of Conferences, 15, 1–8.</bibl>
            <idno type="DOI">10.1051/matecconf/20141501009</idno>
          </bibl>
          <bibl n="138742">Nepal, M. P., &amp;amp; Staub-French, S. (2016). Supporting knowledge-intensive construction management tasks in BIM. Journal of Information Technology in Construction, 21, 13–38.</bibl>
          <bibl n="139396">Sacks, R., Eastman, C., Lee, G., &amp;amp; Teicholz, P. (2018). BIM Handbook BIM Handbook Rafael Sacks 1rd Edition. In John Wiley &amp;amp; Sons.</bibl>
          <bibl n="138853">
            <bibl>Samuelson, O., &amp;amp; Bj&amp;#246;rk, B. C. (2014). A longitudinal study of the adoption of IT technology in the Swedish building sector. Automation in Construction, 37, 182–190.</bibl>
            <idno type="DOI">10.1016/j.autcon.2013.10.006</idno>
          </bibl>
          <bibl n="139133">
            <bibl>Samuelson, O., &amp;amp; Stehn, L. (2023). Digital transformation in construction – a review. Journal of Information Technology in Construction, 28, 385–404.</bibl>
            <idno type="DOI">10.36680/j.itcon.2023.020</idno>
          </bibl>
          <bibl n="136596">Viklund Tallgren, M., Johansson, M., Roup&amp;#233;, M., &amp;amp; Ljung, E. (2022). Developing Support for BIM-based Takt Time Schedules for Production Control. In C. Park, N. Dawood, F. Pour Rahimian, A. Pedro, &amp;amp; D. Lee (Eds.), The future of construction in the context of digital transformation and decarbonization - Proceedings of the 22nd International Conference on Construction Applications of Virtual Reality (pp. 723–730).</bibl>
          <bibl n="138131">Viklund Tallgren, M., Roup&amp;#233;, M., &amp;amp; Johansson, M. (2021). 4D modelling using virtual collaborative planning and scheduling. Journal of Information Technology in Construction (ITcon), 26(42), 763–782.</bibl>
        </listBibl>
      </div>
    </body>
  </text>
</TEI>