It is available online at https://doi.org/10.36253/978-88-5518-184-6
References
Akinci, B., and J. Kunz, R. Levitt M. Fischer. 2000. “Representing Work Spaces Generically in Construction Method Models.” CIFE Working paper (Stanford Univeristy).
10.1061/(ASCE)0733-9364(2002)128:4(296)
Allen, J., and G. Ferguson. 1997. Actions and events in interval temporal logic. ed., Kluwer O. Stock.
10.1007/978-0-585-28322-7_7
Beetz, J., J. Van Leeuwen, and B. De Vries. 2009. “IfcOWL: A case of transforming EXPRESS schemas into ontologies.” Journal Artificial Intelligence for Engineering Design, Analysis and Manufacturing 23 (01): 89-101.
10.1017/S0890060409000122
Benevolenskiy, A., K. Roos, P. Katranuschkov, and J. Scherer R. 2012. “Construction processes configuration using process patterns.” Advanced Engineering Informatics (Elsiever) (26): 727-736.
10.1016/j.aei.2012.04.003
Broekstra J, Klein M, Decker S, Fensel D, van Harmelen F, Horrocks I (2001) Enabling Knowledge Representation on the Web by Extending RDF Schema. In: Shen VY, Saito N (eds) 10th International World Wide Web Conference (WWW10). Hong Kong, pp 467–478
10.1145/371920.372105
Cai, X., Su, H. 2014. “Life Cycle Approach to Construction Workspace Modeling and Planning.” Journal of Construnction Engineering and Management (ASCE) March.
10.1061/(ASCE)CO.1943-7862.0000855
Chau, K., W., M. Anson, and J., P. Zhang. 2004. “Four-dimensional visualization of construction scheduling and site utilization.” Journal of Construction Engineering and Management (ASCE) 130: 598–606.
10.1061/(ASCE)0733-9364(2004)130:4(598)
Cheng, T., and J. Teizer. 2013. “Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications.” Automation in Construction 34: 3–15.
10.1016/j.autcon.2012.10.017
Cherneff, J., M., R. Logcher, and D. Sriram. 1991. “Integrating CAD with construction-schedule generation.” Journal of Computing in Civil Engineering (ASCE) 5 (1): 68-84.
10.1061/(ASCE)0887-3801(1991)5:1(64)
Darwiche, A., R. Levitt, and B. Hayes-Roth. 1988. “OARPLAN: Generating Project Plans by Reasoning about Objects, Actions and Resources.” Artificial Intelligence for Engineering Design, Analysis and Manufacturing 2 (3): 169-181.
10.1017/S0890060400000639
Dawood, N., and S. Sikka. 2009. “Development of 4D based performance indicators in construction industry.” Engineering Construction and Architectural Management (Wiley) 16: 438–458.
10.1108/09699980910988357
Dawood, N., and Z. Mallasi. 2006. “Construction workspace planning: assignment and analysis utilizing 4D visualization technology,.” Computer-Aided Civil and Infrastructure Engineering (Elseiver) 21 (7): 498–513.
10.1111/j.1467-8667.2006.00454.x
Dhillon, R., K., M. Jethwa, and H., S. Rai. 2014. “Extracting Building Data from BIM with IFC.” International Journal on Recent Trends in Engineering and Technology 11 (1).
Drogemulle, H., and R. Schevers. 2005. “Converting the Industry Foundation Classes to the Web Ontology Language.” 2005 First International Conference on Semantics, Knowledge and Grid, Beijing (China), 27-29 Nov. 2005
10.1109/SKG.2005.59
Dudáš, M., O. Zamazal, and V. Svátek. 2014. “Roadmapping and nav- igating in the ontology visualization landscape.” Edited by Springer. Knowledge Engineering and Knowledge Management (K. Janowicz, S. Schlobach, P. Lambrix, and E. Hyvönen) 8876: 137–15
10.1007/978-3-319-13704-9_11
Dzeng, R., J., and I., E. Tommelein. 1997. “Boiler erection scheduling using product models and case-based reasoning,.” Journal of Construction Engineering and Management (ASCE) 123 (3).
10.1061/(ASCE)0733-9364(1997)123:3(338)
Elbeltadi, E., T. Hegazy, and A. Eldosouky. 2004. “Dynamic layout of construction temporary faciltities considering safety.” Journal of Construction Engineering and Management 130 (4): 534-541.
10.1061/(ASCE)0733-9364(2004)130:4(534)
El-Diraby. 2013. “Domain ontology for construction knowledge.” Journal of Construction Engineering and Management (ASCE) 768–784.
10.1061/(ASCE)CO.1943-7862.0000646
El-Diraby, T., and h. Osman. 2011. “Automation in Construction.” A domain ontology for construction concepts in urban infrastructure products 20 (8): 1120–1132.
10.1016/j.autcon.2011.04.014
Farquhar A, Fikes R, Rice J (1997) The Ontolingua Server: A Tool for Collaborative Ontology Construction. International Journal of Human Computer Studies 46(6):707–727
10.1006/ijhc.1996.0121
Fensel D, van Harmelen F, Horrocks I, McGuinness DL, Patel-Schneider PF (2001) OIL: An ontology infrastructure for the Semantic Web. IEEE Intelligent Systems & their applications 16(2):38–44
10.1109/5254.920598
Ferguson, J., Allen. 1997. “Actions and Event in interval temporal logic.”
10.1007/978-0-585-28322-7_7
Fortineau, V., T. Paviot, L. Louis-Sidney, and S. Lamouri. 2012. “SWRL as a rule language for ontology-based models in power plant design.”
10.1007/978-3-642-35758-9_53
Fu, B., N., F. Noy, and M., A. Storey. 2013. “Indented tree or graph? a usability study of ontology visualization techniques in the context of class mapping evaluation.” Edited by Springer. The Semantic Web (H. Alani, L. Kagal, A. Fokoue, P. Groth, C. Bie
10.1007/978-3-642-41335-3_8
Gambatese, J., A., M. Behm, and J., W. Hinze. 2005. “Viability of designing for construction worker safety.” Journal of Costruction Engineering and Management (ASCE) 131 (9): 1029-1036.
10.1061/(ASCE)0733-9364(2005)131:9(1029)
Gasevic, D., Djuric, D., Devedzic, V., (2009). Model Driven Engineering and Ontology Development. Springer, ISBN: 978-3-642-00281-6.
10.1007/978-3-642-00282-3
Gómez-Pérez, A. & Corcho, O. (2002), “Ontology languages for the Semantic Web,” IEEE Intelligent Systems, Vol. 17, no. 1, pp. 54–60.
10.1109/5254.988453
Gruber, T., R. 1995. “Toward principles for the design of ontologies used for knowledge sharing?” Edited by Elseiver. International Journal of Human-Computer Studies 43 (5): 907–928.
10.1006/ijhc.1995.1081
Gu, N., and K. London. 2010. “Understanding and facilitating BIM adoption in the AEC industry.” Automation in Construction 19: 988–999.
10.1016/j.autcon.2010.09.002
Guo, H., H. Li, G. Chan, and M. Skitmore. 2012. “Using game technologies to improve the safety of construction plant operations.” Accident Analysis and Prevention 48: 204–213.
10.1016/j.aap.2011.06.002
Guo, S., J. 2002. “Identification and resolution of work space conflicts in building construction.” Journal of Construction Engineering and Management (ASCE) 128: 287–295.
10.1061/(ASCE)0733-9364(2002)128:4(287)
Hanson, B., and J. Hillier. 1984. The Social logic of space. Cambrige University Press.
10.1017/CBO9780511597237
Hegazy, T., M., and E. Elbeltagi. 1999. “EvoSite: Evolution-based models for site layout planning.” Journal of Computing in Civil Engineering (ASCE) 13 (3): 198–206.
10.1061/(ASCE)0887-3801(1999)13:3(198)
Heijst, G., A., Th. Schreiber, and B., J. Wielingua. 1997. “Using Explicit Ontolgies in KBS Development.” International Journal of Human-Computer Studies (Academic Press) 46: 183-292.
10.1006/ijhc.1996.0090
Hori, M., Y. Nakamura, H. Satoh, K. Maruyama, T. Hama, S. Honda, T. Takenaka, and F. Sekine. 1995. “Knowledge-level analysis for elicting composable scheduling knowledge.” Artificial Intelligenxe in engineering (Elsevier Science Limited) 9: 253-264.
10.1016/0954-1810(95)00004-3
Horrocks I, Fensel D, Harmelen F, Decker S, Erdmann M, Klein M (2000) OIL in a Nutshell. In: Dieng R, Corby O (eds) 12th International Conference in Knowledge Engineering and Knowledge Management (EKAW’00). Juan-Les-Pins, France. (Lecture Notes in Artific
10.1007/3-540-39967-4_1
Jagbeck, A. 1994. “MDA Planner: Interactive Planning Tool Using Product Models and Construction Methods.” Journal of Computing in Civil Engineering 8 (4): 536-554.
10.1061/(ASCE)0887-3801(1994)8:4(536)
Kano, N. 1990. “A knowledge-based system for construction planning and scheduling: a prototype system based on the down-from the-top methodology.” The 7th International Symposium on Automation and Robotics in Construction. Bristol. 303-311.
10.22260/ISARC1990/0039
Kartam, N., A., and R., E. Levitt. 1990. “Intelligent planning of construction projects.” Journal of Computing in Civil Engineering (ASCE) 4 (2): 155-176.
10.1061/(ASCE)0887-3801(1990)4:2(155)
Kassem, M., N. Dawood, and R. Chavada. 2015. “Construction workspace management within an Industry Foundation Class-Compliant 4D tool.” Automation in Construction 52: 42-58.
10.1016/j.autcon.2015.02.008
Katifori, A., C. Halatsis, G. Lepouras, A. Vassilakis, and E. Giannopoulou. 2007. “Ontology visualization methods – a survey.” ACM Computer Survey 39 (4).
10.1145/1287620.1287621
Katifori, A., E. Torou, C. Halatsis, G. Lepouras, and Vassilakis C. 2006. “A comparative study of four ontology visualization techniques in Protégé: Experiment setup and preliminary results.” International Conference on Information Visualisation. IEEE.
10.1109/IV.2006.3
Kim Jongeling, J., M. Fischer, C. Mourgues, and T. Olofsson. 2008. “Quantitative analysis of workflow, Temporary Structure Usage, and Productivity Using 4D Models.” Automation in Construction 17: 780-791.
10.1016/j.autcon.2008.02.006
Kogut P, Cranefield S, Hart L, Dutra M, Baclawski K, Kokar M, Smith J (2002) UML for Ontology Development. The Knowledge Engineering Review 17(1):61–64
10.1017/S0269888902000358
Konig, M., and A. Marx. 2013. “Modeling and simulating spatial requiremts of construction activities.” Winter simulation conference 2013. R. Pasupathy et al.
10.1109/WSC.2013.6721694
Lanzenberger, M., J. Sampson, and M. Rester. 2010. “Visualization in ontology tools.” Proceedings of the International Conference on Complex, Intelligent and Software Intensive Systems. IEEE. 705–711.
10.1109/CISIS.2009.178
Lee, K., J., H., W. Kim, J., K. Lee, and T., H. Kim. 1998. Case and constraint-based project planning for apartment construction. Vol. 19. 1 vols. AI Magazine.
10.1609/aimag.v19i1.1350
Liao, S.H. 2005. “Expert System methodologies and applications - a decade review from 1995 to 2004.” Expert Systems with Applications (Elsiever) (28): 93-103.
10.1016/j.eswa.2004.08.003
Lohmann, S., S. Negru, F. Haag, and E. Ertl. 2014. “Visualizing Ontologies with VOWL.” Semantic Web (IOS Press).
10.3233/SW-150200
Ma, Z., Q. Shen, and J. Zhang. 2005. “Application of 4D for dynamic site layout planning and management of construction projects.” Automation in Construction 14: 369-381.
10.1016/j.autcon.2004.08.011
Maedche A, Motik B, Stojanovic L, Studer R, Volz R (2003) Ontologies for Enterprise Knowledge Management. IEEE Intelligent Systems 18(2):26–33
10.1109/MIS.2003.1193654
Mallasi, Z. 2006. “Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation.” Automation in Construction (Elseiver) (15): 640–655.
10.1016/j.autcon.2005.08.005
Mikulakova, E., M. Konig, E. Tauscher, and Beucke. K. 2010. “Knowledge-based schedule generation and evaluation.” Advanced engineering Informatics 24: 389-403.
10.1016/j.aei.2010.06.010
Mohan, S. 1990. “Expert systems applications in construction management and engineering.” Journal of Construction Engineering and Management (ASCE) 116 (1): 87-99.
10.1061/(ASCE)0733-9364(1990)116:1(87)
Moon, H., H. Dawood, and L. Kang. 2014. “Development of workspace conflict visualization system using 4D object of work schedule.” Advanced Engineering Informatics (Elseiver) 28: 50–65.
10.1016/j.aei.2013.12.001
Moon, H., H. Kim, C. Kim, and L. Kang. 2014. “Development of a schedule workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces.” Automation in Construction 39: 93–105.
10.1016/j.autcon.2013.06.001
Moon, H., H. Kim, V. R. Kamat, and Kang L. 2015. “BIM-based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps.” Journal of Computing in Civil Engineering (ASCE) 29 (3).
10.1061/(ASCE)CP.1943-5487.0000342
Morad, A., A., and Y., J. Beliveau. 1991. “Knowledge-based planning system.” Journal of Construction Engineering and Management (ASCE) 117 (1): 1-12.
10.1061/(ASCE)0733-9364(1991)117:1(1)
Motawa, I., and A., Almarshad. 2012. “A Knowledge-based BIM system for building maitenance.” Automation in Construction (Elseiver) 29: 173-182.
10.1016/j.autcon.2012.09.008
Motta, E. 2000. “The knowledge modelling paradigm in knowledge engineering.” Handbook of Software Engineering and Knowledge Engineering (World Scientific Publishing) 1: 1-29.
10.1142/9789812389718_0024
Mun, D., and K. Ramani. 2011. “Knowledge-based part similarity measurement utilizing ontology and multi-criteria decision making technique.” Advanced Engineering Informatics 119-130.
10.1016/j.aei.2010.07.003
Navinchandra, D., D. Sriram, and R. Logcher. 1988. “GHOST: project network generator.” Journal of Computing in Civil Engineering (ASCE) 2 (3): 239-254.
10.1061/(ASCE)0887-3801(1988)2:3(239)
Noy, N., R., W. Fergerson, and M., A. Musen. 2000. “The knowledge model of Protege-2000: Combining interoperability and flexibility.” Proceedings of the 12th international conference on knowledge engineering and knowledge management. France.
10.1007/3-540-39967-4_2
Riley, D., R., and V. Sanvido. 1997. “Space planning method for multistory building construction.” Journal of Construction Engineering and Management (ASCE) 171–180: 171–180.
10.1061/(ASCE)0733-9364(1997)123:2(171)
Sacks, R., O. Rozenfeld, and Y. Rosenfeld. 2009. “Spatial and Temporal Exposure to Safety Hazards in Construction.” Journal of Cosntruciton Engineering and Management (ASCE) 135 (8): 726-736.
10.1061/(ASCE)0733-9364(2009)135:8(726)
Said, H., and G. Lucko. 2016. “Float Types in Construction Spatial Scheduling.” Journal of Construction Engineering and Management (ASCE) 142 (12): 1-12
10.1061/(ASCE)CO.1943-7862.0001202
Sanvido, D. R. Riley and V. E. 1995. “Patterns of Construction-Space Use in Multistory Buildings.” J. Constr. Engine. Manage. 123 (4): 464-473.
10.1061/(ASCE)0733-9364(1995)121:4(464)
Shaked, O., and A. Warszawski. 1995. “Knowledge based system for construction planning of high-rise buildings.” Journal of Construction Engineering and Management (ASCE) 110 (2): 172-182.
10.1061/(ASCE)0733-9364(1995)121:2(172)
Song, Y., and D. Chua. 2005. “Detection of spatio-temporal conflicts on a temporal 3D space system.” Advanced Engineering Software (36): 814–826.
10.1016/j.advengsoft.2005.03.025
Steuer, J. 1993. “Defining virtual reality: dimensions determining telepresence.” Journal of Communication 42: 73–93.
10.1111/j.1460-2466.1992.tb00812.x
Su, X., R. Andohar, J. Pan, and A. Kandil. 2012. “GIS-based dynamic construction site material layout evaluation for building renovation projects.” Automation in Construciton 27: 40-49.
10.1016/j.autcon.2012.04.007
Sure Y, Erdmann M, Angele J, Staab S, Studer R, Wenke D (2002a) OntoEdit:Collaborative Ontology Engineering for the Semantic Web. In: Horrocks I, Hendler JA (eds) First International Semantic Web Conference (ISWC’02). Sardinia, Italy. (Lecture Notes in Co
10.1007/3-540-48005-6_18
Tah, J., H., M., V. Carr, and R. Howes. 1999. “Information modeling for case-based construction planning of highway bridge projects.” Advances in Engineering Software (Elseiver) 30 (7): 495-509.
10.1016/S0965-9978(98)00128-8
Thabet, W., Y., and Y., J. Beliveau. 1994. “Modeling work space to schedule repetitive floors in mul- tistory buildings.” Journal of Construction Engineering and Management 120 (1): 96–116.
10.1061/(ASCE)0733-9364(1994)120:1(96)
Thomas, H., R., D., R. Riley, and S., K. Sinha. 2006. “Fundamental principles for avoiding congested work areas - a case study.” Practice Periodical on Structural Design and Construction (11): 197–205.
10.1061/(ASCE)1084-0680(2006)11:4(197)
Wang, H., and F. Boukamp. 2011. “Ontology-based representation and reasoning framework for supporting job hazard analysis.” Journal of Computing in Civil Engineering (ASCE) 25 (6): 442–456.
10.1061/(ASCE)CP.1943-5487.0000125
Winch, G., M., and S. North. 2006. “Critical space analysis.” Journal of Construcition Engineering and Management 132: 473–481.
10.1061/(ASCE)0733-9364(2006)132:5(473)
Zhang, S., F. Boukamp, and J. Teizer. 2015. “Ontology-based semantic modeling of construction safety knowledge: towards automated safety planning for job hazard analysis (JHA).” Automation in Construction (Elseiver) 52: 29–41.
10.1016/j.autcon.2015.02.005
Zhang, S., J. Teizer, N. Pradhananga, and C., E. Eastman. 2015. “Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning.” Automation in Construction 60: 74-86.
10.1016/j.autcon.2015.09.009
Zhong, B., L. Ding, H. Luo, Y. Zhou, Y. Hu, and H. Hu. 2012. “Ontology-based semantic modeling of regulation constraint for automated construction quality compliance checking.” Automation in Construction (Elsevier) (28): 58–70.
10.1016/j.autcon.2012.06.006
Zhou, Z., Y., M. Goh, and L. Shen. 2016. “Overview and Analysis of Ontology Studies Supporting Development of the Construction Industry.” J.ournal of Computing in Civil Engineering (ASCE).
10.1061/(ASCE)CP.1943-5487.0000594
Zouein, P., P., and I., D. Tommelein. 1999. “Dynamic layout planning using a hybrid incremental solution method.” Journal of Construction Engineering and Management 125 (6): 400-408.
10.1061/(ASCE)0733-9364(1999)125:6(400)